Free NZ Site Specific Safety Plan (SSSP)

Complete your SSSP online and download a filled PDF instantly.

Site Specific Safety Plan – ConTech Solutions
Health & Safety Documentation

Site Specific Safety Plan

Complete all sections before work commences. Provide to the Principal / Client Representative prior to site mobilisation.

0% complete
1

Cover Information

2

Project Information & Scope of Works

Scope of Works
Subcontractors
A copy of each subcontractor's SSSP must be obtained and retained before they commence work on site.
Subcontractor Company NameScope / TradeSSSP ReceivedNotes
3

General HSE Requirements

Mandatory PPE – Required at all times on Site
PPE ItemStandard / Notes
Hard Hat
Safety Footwear
High-Visibility Vest / Jacket
Eye Protection
Hearing Protection
Gloves
Dust Mask / Respirator
UV Protection
Notifiable Works & WorkSafe NZ Notifications
Notifiable Work requires notification to WorkSafe New Zealand at least 24 hours prior to work commencing.
Notifiable Activities (tick all that apply)
Significantly Hazardous Activities
Tick all applicable activities. Each ticked item must be recorded in the Hazard & Risk Register with a Safe Work Plan.
4

Hazard & Risk Register

Record significant hazards only. Risk levels: Critical / High / Moderate / Low / Very Low. Controls: Eliminate > Substitute > Isolate > Engineering > Administrative > PPE.
Hazard / RiskPotential HarmInitial RiskControl MeasuresResidual Risk
5

Hazardous Products & Substances Register

Complete for ALL potentially harmful products brought on site. A current SDS must be held on site for each item listed.
Product / Substance NameForm (L/S/G)HSNO ClassificationSDS LocationStorage LocationPPE Required
6

Emergency Response Plan

Emergency Contacts
Emergency Services (All)
111
WorkSafe New Zealand
0800 030 040
National Poisons Centre
0800 764 766
Nearest Hospital / A&E
Nearest Medical Centre
Site Supervisor / Foreman
Project Manager
Principal / Client Contact
Trained First Aider
H&S Representative
Emergency Evacuation Procedure
High-Risk Activity Emergency Rescue / Response
Complete one row for each high-risk activity requiring a specific rescue response.
Type of EmergencyWork ActivityRescue MethodResponsible Person & Contact
7

Site Communications, Consultation & Self Inspection

Onsite H&S Communications
Communication MethodFrequency / Details
Project Pre-Start Briefing (all PCBUs)
Daily Pre-Start Briefing
Weekly Toolbox Talk
Progress / Site Meetings (H&S agenda item)
Horizontal Consultation with other PCBUs
Incident / near miss debriefs
Self-Inspection Schedule
Inspection TypeFrequency / Responsible Person
Pre-start site inspection
Weekly site safety inspection
Major plant & equipment inspection
Vehicle inspection
Scaffolding / MEWP / specialist equipment
Electrical equipment (RCD / tagged leads)
8

Environmental Management

For each applicable item describe the mitigation measure. Mark N/A where not applicable.
Environmental ConsiderationApplicable (Y/N/NA)Mitigation Method
Will vehicles or equipment be refuelled on site?
Will concrete or mortar be washed / cleaned on site?
Could site run-off enter a drain or waterway?
Could noise levels adversely affect those outside the site?
Will dust be generated affecting the public or neighbours?
Will fumes or smoke be generated affecting others?
Will waste materials or empty product containers be generated?
Is a sediment control plan required?
Is a spill kit required on site?
Are there resource consent conditions applicable to this work?
9

Supporting Documents & Attachments

Tick whether each document is attached or mark N/A. All attached documents form part of this SSSP.
Supporting DocumentStatusComments / Reference
10

Declaration & Sign-Off

They have read and understood the requirements of this SSSP.
They will carry out work in accordance with the controls listed in this SSSP and the Company HSE Policy.
They understand their obligations under the Health and Safety at Work Act 2015.
Any change to risk, change in scope, or incidents must be reported to the nominated Project Manager and this SSSP updated accordingly.
Work will be suspended if conditions arise that make it unsafe to proceed.
Contractor Preparation & Sign Off
NameRoleDateSignature (type full name)
Worker Sign-on
Full NameCompanyDateSignature (type full name)
Principal / Client Representative Acceptance
Acceptance does not transfer any duty of care or responsibility from the Contractor to the Principal.
Revision History
VersionDateRevised BySummary of Changes

Ready to save your SSSP?

Click below to generate and download a PDF of your completed form.